spacer  
shadow
Becho Logo

projects

Completed Becho Projects

San Francisco Bay Bridge West approach I-80

Wickenburg I-93

Tempe Town Lake

Milltown Dam

Red Cloud

More Picture’s of Jobs Becho has Completed

San Francisco Bay Bridge West approach I-80

General Contractor: Tutor Saliba Corp.

Large diameter pile 2.8 meter to 900mm, 440 Shafts all poured under water, CSL tested by Caltrans. Five year project, Becho had multiple cranes, Drill rig, and Oscillators for both Low clearance, and Large Diameter Piles. Finished early for Tutor Saliba.

Wickenburg I-93

General Contractor: Southwest Asphalt Paving

Becho poured caissons and columns for bridge deck monolithically to save time, and money for the General Contractor and the owner ADOT.  2200mm 120 feet piles while drilling Becho encountered 22,000psi Granite rock which was hand drilled and blasted out in small portions, chisel and grabbed.


Tempe Town Lake

General Contractor: McCarthy Construction

Becho had four drill rigs, two cranes, and oscillators drilling in water, cobble and boulders using casing was used to keep the cost of concrete overrun down for the General Contractor who was purchasing the concrete.

Milltown Dam

General Contractor: Conti Construction

Reinforcing the existing piles, Becho’s barges, equipment and crews worked 24hrs a day 7 days a week to under pin the I-90 Freeway project for Montana DOT. Emergency Project for MDOT

Red Cloud

General Contractor: Granite Construction

43,000 square foot soilnail wall, completed in three and half months. 27,000LF of soilnails drilled, 2,500 yards of shotcrete placed, and then for environmental friendly design placed sandstone rocks to enhance the design.

More Picture’s of Jobs Becho has Completed

Some of Becho's Completed Projects

Project Date Description Contractor Location
Church History Library 2007 Deep excavation SoilNail wall, Jacobsen/Swinterton JV Salt Lake City
LDS Church 2006 Micro Piles for tunnel under West Temple LDS Church Utah
         
Mckenzie River I -5 Bridge 2007 8 Caissons for new bridge 2 meter Shafts Hamilton Construction Oregon
    Fast track project for fish window ODOT  
         
Sauk River Bridge 2007 2.8 Meter Oscillated Shafts Mowatt Construction Darrington
    Caissons for new bridge fast track project Eugene Oregon Washington
         
Tanner Bldg BYU 2007 Micro piles, and shoring for excavation Jacobsen Construction Provo
      LDS Church Utah
         
Milltown Dam I-90 2007 Reinforcing the existing piles, Drill thru Solid Steel Conti Missoula
Montana Dot   Emergency Project for MDOT Montana DOT  
         
Fontainebleau Casino 2007 756 caissons 36"diameter Completed in 3 months Turnberry West Las Vegas
Podium South   Drilling in hard caliche   Nevada
         
Red Cloud Condos 2007 47,000 SoilNail,  Double wall shotcrete 9"  Granite Construction Park City
  2006 2500cuyd of shotcrete   Utah
         
Encore Phase 2 2007 Caissons & Tie backs Tutor Saliba Las Vegas,
Wynn Casino 2006     NV
         
Planet Hollywood 2007 36" to 48" diameter Caissons up to 105' deep Tutor Saliba Las Vegas
Aladdin Hotel 2006 Excavation & Shoring   Nevada
         
San Francisco 2007 24" to 120" diameter Caissons up to 154' deep Tutor Saliba San Francisco
Bay Bridge 2003     California
         
Hayden Ferry Lake 2006 60 caissons, 48" diameter, 50' deep McCarthy Building Corp. Tempe
Side Condos   Drilled 3' into Basalt Bed Rock   Arizona
         
MGM Grand 2006 104 caissons, 4' diameter, 55' to 80' deep Marnell Corrao Las Vegas
Tower C   Drilling in hard caliche   Nevada
         
MGM Grand 2005 104 caissons, 4' diameter, 55' to 80' deep Marnell Corrao Las Vegas
Tower B   Drilling in hard caliche   Nevada
         
University of New Mexico 2005 210 each, 2' dia. to 7' dia. caissons 65' deep Jaynes / J.E.Dunn J.V. Albuquerque
Children's Hospital   20,000  square feet of shoring   New Mexico
         
Sky Harbor Intl 2005 59 caissons, 5' to 8' diameter D. L. Withers Phoenix
Economy Parking Str.   50' deep   Arizona
         
I-5 Bridge Over the 2004 7' diameter caissons, up to 60' deep Hamilton Construction Co. Eugene
Willamette & McKenzie River   in 15,000 psi rock   Oregon
         
Bellagio Hotel Casino 2003 217 caissons 3' diameter 40' deep Marnell Corrao Las Vegas,
Spa Tower   Load test to 2,300,000 lbs. So. Polaris Nevada
         
Inn of the Mt Gods 2003  489 caissons 2' to 5' diameter Centex Construction Co. Mescalero, NM
    40' to 80' deep    
         
Big I Project 2001 3' to 10' diameter caissons 90' deep Twin Mt. Construction Albuquerque
Albuquerque Highway     Albuquerque, New Mexico New Mexico
         
Benicia Bridge 2001 8' diameter caissons 86' deep Mowat Construction San Francisco
New Bridge   in Sandstone Bedrock Woodinville, Wa. 98072 California
         
         
INTEL Fab 22 2000 3' to 7' diameter caissons Hoffman General Contractor Phoenix
    35' to 55' deep Chandler, Arizona  85248  
         
Main Street Parking 1999 200 each caissons with tiebacks, Jacobsen Oakland JVT Salt Lake City
Garage   underpinning, & lagging Salt Lake City, Utah  
         
Marriott Mt Side 1999 200 + caissons 2' to 6' diameter EMJ Corporation Park City, UT
Resort   Drilled into Limestone Bedrock 20' to 40' deep Fort Worth, Texas  
         
Rail Road Shoe Fly 1999 Shoring and tiebacks D H Blattner  
Behind Rio Casino     St. Paul, Minnesota  
         
Venetian Casino 1998 3' diameter caissons 40' deep Lehrer, McGovern & Bovis Las Vegas
      Las Vegas, Nevada 89109  
         
Ferry St. Bridge 1998 5' diameter caissons in Basalt Bedrock Mowat Construction Eugene, Oregon
    in tight conditions with low overhead clearance Woodinville, Wa. 98072  
         
Sahara Casino 1997 6' & 7' diameter caissons Hensel Phelps Const Las Vegas
    35' deep Las Vegas, NV 89114  
         
Geoff Bridge 1997 Drilled from barge in the Snake River Harcon, Inc. Riggins, Idaho
    2 each caissons 5' diameter, 60' deep Spokane, Wa.  
    in 28,000 psi bedrock    
         
Rio Casino 1996 3' to 6' diameter caissons into Marnell Corrao Las Vegas
    caliche, approximately 40' deep Las Vegas, Nevada  
         
New York New York 1996 3', 4' & 5' diameter caissons Marnell Corrao Las Vegas
Casino   50' deep Las Vegas, Nevada  
         
Circus Circus 1995 3' to 9' diameter caissons Perini Building Company Las Vegas
Grand Slam Canyon   Varied 35 feet to 45 feet in Las Vegas, Nevada 89103  
    depth.     
         
Treasure Island 1993 4' diameter caissons 35' deep Marnell Corrao Las Vegas
      Las Vegas, Nevada  
         
         
Flamingo Hilton 1993 150 caissons 4' to 7' diameter Mardian Construction Laughlin
    35' deep Perini Building Company  
         
Station Casino, Inc. 1993 2' diameter caissons 40' deep Marnell Corrao Las Vegas
      Las Vegas, Nevada  
         
Holiday Inn 1990 300 each 3' diameter caissons Mardian Construction Las Vegas
(Harrah's Club)     Perini Building Company  
      Las Vegas, Nevada 89103  
         
Circus Circus 1986 600 each, 3' diameter caissons, 30' deep Marnell Corrao Laughlin
Hotel     Las Vegas, Nevada